I plan on taking The Bomb down to El Mirage this coming weekend of July 18-19 to
try her out. Hopefully I can get her rigged up properly and get some sailing
in. Almost done lengthening the harbor freight trailer so I can transport her.
The two Mantas will be racked above The Bomb and I've extended the trailer
length by ten feet. Still need to replace and pack the wheel bearings and
replace some pop rivets in the skin. Did replace the lap belt with a four point
harness and made a comfi seat. Really looking forward to sailing her.
Jerry